I use MF Cobol with Linux Red Hat 7.2 and it's ok, now I have installed Red Hat 7.3 (kernel 2.4.18-3) and I have this problem : Whit the statement Accept ... from date, the date it's wrong. It's always 700104 !!!! The system's date it's ok and with other language (php) it's ok. I think that this isn't a date but why ? And what can i do ? Thank pac